Execution of Civil work for Telecom Towers in Coastal area during Monsoon

The Customer:

Aircel –Is a leading cellular provider which commenced its operations in 1999 in India. It quickly established itself as a market leader – a position it has held since. Aircel is currently operational in 22 telecom circles of India.

The Challenge:
The customer has large number of telecom towers installed at different locations within India. The challenge was to complete the civil foundation for Telecom Tower at sites in coastal region of Karnataka, India within a short period of time. The interior regions had no defined access to the sites; area was prone to landslides, incessant rains and water seepage during excavation.

The Solution:
Mack Telecom engineers analyzed the customer’s requirements and planned the route/path through the site map. Restricted water entry to the working spot, prepared an exit path for the rain water by providing necessary scaffolding and continuously pumped out the water and simultaneously poured the concrete for raft completion. Executed around 22 sites in such condition within 3 months time.